Container
Project: Container converted to a transportable bartender school
Date: 2011 Scope: Architectural design, mechanical design and construction |
In order to accommodate 20 seating people, working bench with sink, table, liquor display storage space, two 40inch TV screens, audio system, refrigerator, washing machine, electric generator, WC and a pair of 1 ton tanks for fresh and waste water, the container was designed to expand and contract from 2,45 m to 4,70 m. Sheet metal was formed to serve as finishing surface and at the same time as the main frame, achieving this way very small setup times (less than 30 sec).
|
|
Project-specific design
All furnishing, lighting system, door handles and locks are specially designed for the project. Photo credits: Thomas Ditsas, Zoe Langie Video: Diagio, Thomas Ditsas |